Big Sky Dairy Farms Manager contacted P&W Dairy Services and
asked if we could fix the drive beam and
rollers under his Donald Platform, as it was worn out and
had been repaired quite a few times in the past.
Both Steve Miller(Dairy Services Project
Manager) and Kelvin Wright(P&W Design Manager) travelled
up to Patearoa to evaluate the various options and discuss
them with "Big Sky".
Upon Investigation it was noted that things where in a bad way
and the only real option was to replace the Drive Beam, Rollers and
Pedastals.
The timeframe that was given to complete the work was very tight
(4 Weeks from the start to finish) so in this case having the
backup of the P&W Engineering Fabrication and Machining Divisions was an
absolute saviour.
We decided that a 200UB was the way to go for ridgidity and
strength also allowing for a wide point of contact between the Beam
and Rollers (130mm). The Rollers where mounted on fully
adjustable Pedastals to allow for easy setup and ongoing
maintenance adjustments that are needed overtime and because the
platform is light a wearstrip was not needed. Automatic grease
dispensers where installed doing away with the old oil
bath these are less trouble and alot cleaner.
The old beam and Rollers where taken out and the new setup
installed in 5 days with a team of 4 staff. Big Sky have around
1100 Cows going over this platform twice a day at its peak and the
drivebeam and rollers are preforming to expectation. Another happy
customer
|