Cadbury's Crumb Plant

The fire escape shown here is attached to the outside north east face of the Cadburys crumb manufacturing plant building and is one of the longest hot dip galvanised fire escapes we have made.

 

Within the building behind the fire escape is Cadburys crumb manufact...

Client: Cadburys, Stevenson & Williams and Duffill WattsDate: Project Number: 19267

Pacific Chieftain

The Pacific Chieftain was due for a 25 year survey and port side engine replacment to match the starboard side which was replaced approx 2 years earlier.

P&W alo...

Client: Diverse EngineeringDate: 01/07/08Project Number: 21432

Meridian Clock

P&W were first approached to service, patch and rebuild the clocks internal frame and body. Also later to supply concept designs for mounting this clock onto the building.

We found after a closer inspection the internal frame was badly damaged and twisted. Mostly from the we...

Meridian Clock
Client: Meridian MallDate: Project Number: 17257

Dunedin City Airport

Client: Dunedin City AirportDate: Project Number: read more

Air New Zealand

Client: Air New ZealandDate: Project Number: read more

Glidepath

Client: Date: Project Number: read more

Garlick Engineering

Client: Garlick EngineeringDate: Project Number: read more
Copyright © 2010 PW Engineering Limited. All rights reserved. Site design by media corporation