Intake & Blending Plant

Client:Ravensdown
Location:New Plymouth
Start Date:August 2016
Completion Date:March 2018

In November 2013 Ravensdown engaged PW to develop the conceptual design and form a scope of work for their new facility in New Plymouth. PW was instrumental in linking the building design in with the mechanical plant and after 2 years of planning manufacturing started in August 2016.

The intake equipment was manufactured in Mosgiel and transported by road to New Plymouth for installation by our site team. PW fabricated the structural steework for the blending plant and manufactured the stainless steel hoppers before assembling the system complete with the specialist mixing plant from Sackett Waconia USA.

After commissioning the plant was handed over to the Ravensdowns operations team in March 2018