Precision Blending Tower

Client:Ravensdown
Location:Christchurch
Start Date:2014
Completion Date:2016

The ground breaking precision blending tower for Ravensdown in Christchurch has been an exciting project to be involved with. This innovative system has necessitated the accurate fabrication of complex steel structures in order to integrate with the required plant. Along with the manufacture and erection of the main structure PW has assembled and installed the specialist mixing & conveying equipment procured from A.J Sackett & Sons. The stainless steel main holding hoppers were also fabricated by PW and the access ways are fitted with FRP grating and handrails to withstand this corrosive environment.

 

For a video and fly over of the system see the following link from Ravensdown:

https://www.youtube.com/watch?v=Oqskhj0q8F8