Venison Processing

Client:Alliance Group
Location:Lorneville
Start Date:July 2017
Completion Date:Sep 2018

Project planning began in 2017 where PWE consulted with Alliance to determine the scope and design of the 'black steel' mechanical equipment at the new venison processing plant in Lorneville. PWE were awarded a design and build contract using NZS3916 in Jan 2018, the tight timeline required PWE to work closely with other contractors to acheive operational testing by Sep 2018. The equipment supplied by PWE included:

  • Loading ramp
  • Yard gates & overhead walkways
  • Knock box
  • Slaughter board equipment, hoists, inverted dresser, hide puller
  • Meatrail to chillers
  • Chiller support steel and meat rail
  • Boning room rail and hoists
  • Prebreak room hogger installation and screw conveyor
  • Compressor and receiver installation