P&W were approached by ACME Drum & Metal to install an Palfinger PK20002 crane and a 5.8m tip deck to their 8 x 4 ISUZU.
P&W also fitted a grapple and rotator with quick release capability to provide easy lifting capability of any sha...
Bradkens PTY LTD had a requirement for a 2000kg over head gantry crane at their Dunedin facility.
P&W won the contract to design, build and install the 7m x 18m gantry crane which covers a very large floor space and varying load types and sizes. The crane wa...
Oncology Bunker: This job involved moving 9.2 tonne of steel in to two levels of the hospital from the ambulance area through the wards without any disruption to ambulance services, public, wards and or staff. The steel was then placed vertically in the bunker and was up to 50mm thick. O...
Newlcast Pty Ltd in Dunedin approached P&W with regard to improving their sand delivery processes. Issues with their process included slow sand flow rates and controllability of the sand flow i.e. stopping the flow. Previously sand pipes had been gravity feed, which restricted operat...
Architectural Houses both metalwork and structural steel, Architectural features, handrails stainless steel and galvanised. Working on some of Dunedin's historical buildings and Victorian Mansions some examples would be Larnach Castle, Port Chalmers old Town Hall now Library, Ex Wilson W...
P&W won the contract for the supply and installation of the steelwork for 3 extra floors to be added to the existing Otago House building in central Dunedin.
Over all 3 floors, P&W has added approximately 300 tonnes of steel to the already impressive ...
Back In Motion Physiotherapy
Examples of physiotherapy equipment built by P & W Engineering Ltd
Waste Solutions Ltd Anerobic Reactor- 2009
Stainless Steel fabrication manufactured to Clients design.
Briford trailer modified to transport woolpress to farms by shearing contractors for Wooltech, deck raised by screw rods to accommodate varying heights of woolshed loading bays.