44 Aside Herringbone Dairy Platform

MFS - Campbell Park

The Challange

To build and install a 44 aside HLHB on a newely converted farm up at Campbell Park Duntroon.

After final consultation with the farmer drawings where finalised and sent for consent.

With Croft Construction Kurow Limited given the nod to build the shed and pour the yard, we where tasked with errecting the main beams and portals, installing Rump and Kick rails, installing the milkplant and completing the yards.

Watersmart Engineering Ltd where in charge of the plumbing.

Laser Electrical Oamaru where in charge of the wireing.

Brosnan Refridgeration where in charge of the cooling.

Milkplant consisted of, Milkaware TL20 Pulsators, Milkpurge, Milkaware Variable Speed Milkpump Controller, Milkaware Starlite Clusters, MP4000 Variable Speed Vacuum Pump, Retaractable Jetter Line and Milkaware wash controller. 

Solar Powered Backing Gate supplied by Cullimore Engineering

Engineering New Zealand, PW Engineering, Dunedin, New Zealand
Impac Prequal, PW Engineering, Dunedin, New Zealand
Competenz, PW Engineering, Dunedin, New Zealand
New Zealand Safety Council, PW Engineering, Dunedin, New Zealand
MPTA, PW Engineering, Dunedin, New Zealand