
Many options were explored to come up with a viable way to contain the dust and maintain heavy traffic throughput.

A simple shed with an integrated loadout conveyor was elected as the best idea, and a detailed design was produced for approval.

The new shed contains the dust and the dust suppression hopper works to keep dust generation to a minimum.

This project enables Ravensdown to safely load out the full range of fertiliser products with minimal environmental impact.