The concept design was developed into a fully detailed 3D model to integrate the mechanical plant with the building structures fully.

Our skilled fabrication team manufactured the 'black' steel equipment in accordance with the design specifications.

Over a period of 9 months, our equipment was manufactured and installed in parallel with building construction and essential services.

The new facility was successfully opened on time, satisfying the operational needs and business objectives.