
Our Design Engineers measured and designed the replacement bin with a new style of screw conveyor that would offer greater reliability and more consistent material flow.

The new feed hopper and screw conveyor were fabricated and pre-assembled in our workshop, ready for installation.

Installation involved taking the roof off the building to remove the old bin before lifting the new one in with a crane. Our skilled tradesman carried this out efficiently and safely.

The new bin fitted perfectly, exceeding expectations with greater reliability and improved operation.