Automation provides greater efficiency and product quality

A lime quarry with rundown and outdated equipment was in dire need of replacement. Utilising automated control and modern processing systems, this project provided the opportunity to bring this plant into the 21st century, delivering higher throughput rates and improved product quality.
project dipton lime materials handling pw engineering dunedin new zealand 01

Geotechnical Challenges

This project included substantial civil works presenting geotechnical challenges. This was a significant part of this project which set the course for the optimal plant layout and design.

project dipton lime materials handling pw engineering dunedin new zealand 02

Enhanced Planning with 3D Modelling

The entire site was 3D modelled to ensure the best possible process design and co-ordinate the complex civil and structural works.

project dipton lime materials handling pw engineering dunedin new zealand 03

Innovation for Greater Efficiency

The new plant featured a co-current dryer, Casmill pulverised coal burner and efficient multi-clone extraction for a higher throughput of limestone.

project dipton lime materials handling pw engineering dunedin new zealand 04

Improved Throughput and Reliability

Our client was delighted with the outcome, which has delivered many long-term benefits to their operation.

Project Gallery

HERA, PW Engineering, Dunedin, New Zealand
Engineering New Zealand, PW Engineering, Dunedin, New Zealand
Prequal, PW Engineering, Dunedin, New Zealand
Competenz, PW Engineering, Dunedin, New Zealand
New Zealand Safety Council, PW Engineering, Dunedin, New Zealand