Essential plant upgrade increases throughput and reliability

Essential plant upgrade increases throughput and reliability
A collaborative approach was taken to this complex project. Our ethical practice ensures we work within our competence by seeking structural advice when needed and developing sustainable high-value solutions for our clients.
project ravensdown christchurch materials handling pw engineering dunedin new zealand 01

Asset at the End of Life

With severe reliability problems and limited throughput, a replacement screening plant was required.

project ravensdown christchurch materials handling pw engineering dunedin new zealand 02

Client Led Specifications

Working closely with our client to identify the project’s requirements, we developed a suitable design with structural input from TM Consultants.

project ravensdown christchurch materials handling pw engineering dunedin new zealand 03

Safe Access and Reliability

The objectives are achieved with higher production rates and safe access for cleaning and maintenance staff.

project ravensdown christchurch materials handling pw engineering dunedin new zealand 05

Planning for Future Projects

Continuing from this project, we planned and replaced a large bucket elevator with a new stainless steel design to provide a long service life.

Project Gallery

HERA, PW Engineering, Dunedin, New Zealand
Engineering New Zealand, PW Engineering, Dunedin, New Zealand
Prequal, PW Engineering, Dunedin, New Zealand
Competenz, PW Engineering, Dunedin, New Zealand
New Zealand Safety Council, PW Engineering, Dunedin, New Zealand