
With severe reliability problems and limited throughput, a replacement screening plant was required.

Working closely with our client to identify the project’s requirements, we developed a suitable design with structural input from TM Consultants.

The objectives are achieved with higher production rates and safe access for cleaning and maintenance staff.

Continuing from this project, we planned and replaced a large bucket elevator with a new stainless steel design to provide a long service life.