
Multiple concept designs were evaluated against the project objectives before the best option was selected.

Featuring twin hoppers and a recirculating overs crusher circuit, we developed the design and specifications to gain approval for this project.

Demolishing the old elevator, pit and screen structure needed to happen before the new equipment was installed over the Winter shutdown.

The new Metso screen provides high quality and throughput, while the belt conveyors increase reliability and improve access for the operators.