
This badly corroded conveyor and walkway compromised safety and efficiency. To mitigate risk, a replacement system was required.

The solution featured a tripper car and a new support structure while the building was repaired and strengthened.

Building life has been extended by the structural upgrade, and the new walkway provides safe access for staff.

Optimal storage has been realised by way of the new tripper car, which efficiently forms the bulk material pile.