PW Engineering have worked with Keep it Clean (now a Wallace Group site) on many upgrades over the years and this example is a replacement receival bin for their pre-breaker infeed system. Our Design Engineer improved the design to resolve several problems with the old bin and our site crew removed and installed the equipment over the 2018/19 Christmas shutdown so that there was no downtime impacting on production.