Our Design Engineers partnered with Ravensdown to identify the needs and develop an economical and practical design.

Installation was planned over the Winter shutdown to minimise disruption to operations.

Using equipment from the USA, our project engineers developed a coating system for nitrogen products allowing continuous manufacture direct to truck.

The new twin-lane dispatch allows higher traffic movements, reducing waiting times and increasing business for Ravensdown.