Planning started in early 2020 with conceptual layouts of various intake designs. This ensured that any work contributed to the overall long-term plan.

Phase 1 was to replace the conveyor and walkway in store 6, install the tripper car and strengthen the building during Winter 2021.

Phase 2 extended the new conveyor through into the adjacent store, where the access was now linked up, and the tripper car runs the length of both stores.

This work carried out over 3 years has resulted in increased storage, greater efficiency and safer access for personnel.